A local Texas engineering firm engaged with the WSB technology team to update a 5-year old sign inventory of the Sam Rayburn Tollway (SRT). This unique 16 mile stretch of road that needed to be inventoried in both directions and included multi-level stacked interchanges, frontage roads, approaches and all on/off ramps. WSB was tasked with capturing the locations of thousands of street signs along this busy and complicated segment of highway as quickly and accurately as possible.
Our WSB 360° team mounted our NCTech Pulsar+ camera and drove every road in the designated area capturing imagery of all roadways and signage. Using a map tracking system of our routes, we were able to post process and coordinate any necessary reshoots in a little over one week.