October 23, 2024
We are excited to be part of the Orion Solar Belt project, a remarkable 900 MWdc solar power-plant that recently began commercial operations in Texas. Our team contributed to this project by conducting the survey and providing full civil, hydrology, and pile plan design for this initiative.
As Google’s largest solar energy investment to date, this project will power the company’s data centers in Ellis County, Texas, and plays a vital role in their commitment to achieving carbon-free energy by 2030.
Notably, this project included Google as a primary off-taker and complied with the domestic content provisions of the Inflation Reduction Act, enabling them to secure an additional 10% investment tax credit. It utilized 1.3 million American-made solar modules from First Solar, domestic steel from Gerdau Steel in Midlothian, Texas, and components from Nextracker Inc., predominantly produced in the U.S.
For more information, visit: https://www.msn.com/en-us/money/companies/google-backed-orion-solar-belt-farm-opens-in-the-us/ar-AA1sDOXm